BC Hydro was established to plan, operate and maintain BC's publicly owned transmission system. We are here to ensure fair and open access to the transmission system. If you are a generator owner or an independent power producer (IPP) who wishes to interconnect or modify your existing connection to the transmission system, we are your single point of contact.

BC Hydro's generator interconnection procedures are governed by our Open Access Transmission Tariff (OATT). The OATT was approved by the BC Utilities Commission and has been effective since March 1, 2006.

Getting Connected

There are two interconnection procedures available:

There is also a Grandfathered Interconnection Process that is no longer available to new interconnection customers. This process is applicable only to proponents who submitted their interconnection requests prior to March 1, 2006. All requests submitted from March 1, 2006 onwards are subject to OATT and must follow one of the interconnection processes outlined above.

BC Hydro Information

Contact Us

Connecting to the system at transmission voltage (60 kV and above), contact BCTC's Interconnections Group:

  • Bryan Corns, Interconnections Manager, ph: 604.699.7368
  • Ryan Hefflick, Client Services Manager, ph: 604.699.7382
  • Lorrie MacGregor, Client Services Manager, ph: 604.699.7619
  • Jason Rennie, Client Services Manager, ph: 604.699.7468
  • Email: BCTC Interconnections
  • Fax: 604.699.7539

    Back to Top

What's New

Jul. 5
Redesigned Internet Site - BC Hydro Integration: As part of the integration with BC Hydro, BCTC has redesigned its internet site. BCTC is planning to launch the new site from 21:00 PPT to 22:00 PPT on July 4. The cut-over will take place at some point during this hour and may take several minutes to complete. During this time users may see a server error message or a message that the site can not be found. Bookmarks and URLs will continue to work once the site is back up and running.
Jun. 26
As of July 1, 2009, pursuant to Section 8.2 of the SGIP (Attachment M of BCTC’s Open Access Transmission Tariff), BCTC will bill monthly for Interconnection Facilities Studies. Please direct queries to BCTC Interconnections team at BCTC.Interconnection@bctc.com
Jan. 23
New Subscription feature added to Generator Interconnections page.
Dec. 8
BC Hydro 2008 Bioenergy Call RFP announces 4 successful proposals
Nov. 17
BC Hydro 2008 Clean Power Call RFP results in BCTC performing 70 Feasibility Studies.
Nov. 12
First project in BC Hydro Standing Offer Program (SOP) nominated as system resource. Cypress Creek IPP in the process of commissioning their 3.15 MW project connected to Gold River substation.