BC hydro: Transmission
Go to bchydro.com
Search Button
  • Projects
    • Overview
    • Events
    • Seymour Arm Series Capacitor (SASC) Station Project
  • Transmission System
    • Overview
    • Actual Flow Data
    • ATC Methodology
    • Balancing Authority Load Data
    • Engineering Studies & Data
    • Maps
    • Reliability
    • System Operating Orders
    • System Outages
    • Transmission Planning
  • Regulatory Filings
    • Overview
    • Capital Plan
    • Capital Projects
    • Revenue Requirements
    • Tariff
    • Other Filings
  • Generator Interconnection
    • Overview
    • Load Interconnections
    • Requirements
    • Standard Generator Interconnection Procedures
    • BC Hydro’s Calls for Power: Interconnection Procedures
    • Queue
    • Engineering Studies & Data
    • Workshops & Presentations
    • FAQ
    • Contact Us
  • Transmission Scheduling
    • Overview
    • Agreements
    • Bulletins
    • Business Practices
    • Customer Service
    • OASIS
    • Study Metrics
    • Tariff & Pricing
    • Transaction Data
    • Transmission Services
    • Workshops & Presentations
Home > Generator Interconnection > Standard Generator Interconnection Procedures > Forms & Agreements

Forms & Agreements

Interconnection Documents

Interconnection Request for a Generating Facility (XLS, 120KB, Posted: Feb 21, 2011)

  • Feasibility Study Data Form (XLS, 660KB, Posted: March 20, 2012)
  • System Impact Study Data Form (XLS, 720KB, Posted:March 20, 2012)


  • OATT SGIA – Standard Generator Interconnection Procedures & Agreement – OATT Attachment M (PDF, 1.6MB)
    • Interconnection Feasibility Study Agreements Attachment M – Appendix 2 (PDF, 48KB)
    • Combined Study Agreement Attachment M – Appendix 3 (PDF, 89KB)
    • Optional Interconnection Study Agreement Attachment M – Appendix 4 (PDF, 43KB)
    • Standard Generator Interconnection Agreement Attachment M – Appendix 5 (PDF, 918KB)

Supplemental Documents

  • Site Control Criteria (PDF, 321KB)
  • OATT – Attachment O – Recovery of New Facilities Costs (PDF, 73KB)

 

In this section:

  • Proceeding through the SGIP

Generator Interconnection

  • Overview
  • Load Interconnections
  • Requirements
  • Standard Generator Interconnection Procedures
  • BC Hydro’s Calls for Power: Interconnection Procedures
  • Queue
  • Engineering Studies & Data
  • Workshops & Presentations
  • FAQ
  • Contact Us
Copyright 2012 © BC Hydro. All Rights Reserved.
  • Go to bchydro.com
  • Login
  • Subscription
  • Legal
  • Privacy Statement
  • Site Index